zaterdag 6 september 2008
First Frame Section Finished
Done, I have done it !!!!!! The first frame section is finished, the section that will hold the seats, fuel tank, steering and front suspension. Now it is back to the drawing board and ordering components.
I need to work on the final design of the front suspension, the steering, the engine and rear suspension. The basic designs are ready and now this frame section is finished it is a lot easier to do the final bits.
Abonneren op:
Posts (Atom)